PCCP Constructors Joint Venture

Drilled Shafts

PCCP Constructors Joint Venture – 17th Street Canal Flood control Structure New Orleans, La.

GROUP Deep Foundations was contracted by PCCP Constructors to drill out pipe piles that were 30” in diameter.  What makes this project different from others was the work was 30 feet below sea level inside of a coffer dam which the drill rigs had to be flown into the hole utilizing an engineered lift plan and the piles had to be drilled out at night to accommodate the work schedule of our client.  This made for a difficult working environment, however, due to our commitment to safety the project was completed without incident and ahead of schedule.