Greenbury Flint Hills

Auger Cast Piles

Greenbury – Flint Hills – Port Arthur, Tx. 

GROUP Deep Foundations was contracted by Greenbury Industrial to install auger cast piles at the Flint Hills Facility in Port Arthur Texas.  This project consisted of installation of a pile load test, low strain dynamic testing and 110 each 2ft diameter x up to 70ft long auger cast production piles.  This project is currently ongoing and once complete GROUP Deep Foundations will have placed over 900 cubic yards of grout.