DOW Fender Repairs & Debris Removal

Marine Services

Dow Chemical Plaquemine Site – Fender Repair, Deflector barge repair, dock repair and debris removal

GROUP Deep Foundations was contracted by DOW Chemical to mobilize a crane and excavator on a barge for the repair work caused by a ship impacting its deflector barge along with debris removal and fender replacement and repairs.  Several wood timbers were changed and the supports were repaired on the main dock at DOW.  Along with the main dock repairs, GROUP removed the guides holding the deflector barge and fabricated new guides and installed them.  After all repair work was completed, GROUP then removed all wood debris floating in and under the dock caused by high water.  Value of this project was approximately $300,000.00